精品国产乱码久久久久软件_精品av无码国产一区二区_午夜精品一区二区三区的区别_国产成人艳妇aa视频在线_无码aⅴ精品一区二区三区浪潮

上海金泰工程機械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

主站蜘蛛池模板: 亚洲av电影天堂男人的天堂| 综合人妻久久一区二区精品| 国产精品无码一区二区三级| 亚洲国产精品成人精品无码区| 精品亚洲a∨无码一区二区三区| 正在播放国产对白孕妇作爱| 少妇性荡欲午夜性开放视频剧场| 国产精品污www一区二区三区 | 性色av无码一区二区三区人妻| 久久久久久久极品内射 | 久久久噜噜噜久久熟女| 亚洲色偷精品一区二区三区| 人妻无码人妻有码中文字幕 | 免费观看18禁无遮挡真人网站| 国产精品成人无码久久久| 精品久久久久久中文字幕 | 色宅男看片午夜大片啪啪| 亚洲爱婷婷色婷婷五月| 五月激激激综合网亚洲| 精品无码成人网站久久久久久| 亚洲欧美日韩综合久久| 凹凸国产熟女精品视频| 青青青伊人色综合久久| 特级a欧美做爰片第一次| 国产免费无遮挡吸奶头视频| 99久久久无码国产精品6| 国产一区二区三区日韩精品| 亚洲欧美激情精品一区二区| 成人亚洲欧美在线观看| 国产精品久久久久久久久绿色| 四虎影库在线永久影院免费观看| 欧美精品在线观看| 亚洲av伊人久久综合密臀性色| 亚洲日本va午夜在线电影| 妺妺窝人体色www在线下载| 激情综合婷婷色五月蜜桃| 国产成人精品2021| 99re热视频这里只精品| 欧洲肉欲k8播放毛片| 欧美人与动牲交欧美精品| 久久黄色视频|